1.3 CAD Iterations

Initial CAD work. Still more to do to get it right especially since the plan is for the whole top ramp to pivot back and down, not tilt.

Almost there!!!

Few design tweak and soon its off to the construction phase!

Couple last minute tweaks with the hydraulic system then finalizing everything!